Town of South Windsor Question 1 — $15,000,000 town-wide road, signal, culvert, sidewalk and drainage bonds (Capitol Planning Region)
Ballot measure · November 3, 2026 · South Windsor Township voters
Results: the official election results site. Counts are unofficial until certified.
- What it does
- Shall the resolution appropriating and authorizing bonds in the amount of $15,000,000 for the planning, design, construction and/or replacement of Town-wide Road Paving, Traffic Signals, Safety Devices, Culverts, Sidewalks And Drainage Improvements be approved?
- A YES vote means
- South Windsor would approve $15,000,000 in spending and bonds for town-wide road paving, traffic signals, safety devices, culverts, sidewalks and drainage improvements.
- A NO vote means
- South Windsor would not approve this $15,000,000 spending and bond authorization.
- Needed to pass
- A simple majority: more than half of the YES and NO votes on this measure must be YES. Leaving it blank doesn't count either way.
- Left–right lean
- Not a left–right issue: a procedural or local question that liberals and conservatives don't typically split on (AI read of the official ballot summary).
See your members of Congress and every race and measure on your ballot in Capitol Planning Region, from your address. Your address stays in your browser.Look up my races
Next elections here
Also on Capitol Planning Region ballots
- Town of Coventry Question 1 — Charter: appropriation approval threshold as a percentage of the tax levy
- Town of Coventry Question 2 — Charter: additional revisions
- Town of Enfield Question 1 — $511,000,000 elementary schools construction project
- Town of Enfield Question 2 — Charter revision
- Town of Newington Question 1 — $7,800,000 Fire Station #4 Project
- Town of Simsbury Question 1 — Charter Revision
- Town of Southington Question 1 — $86,675,560 Elementary Facilities Plan
- Town of Tolland Question 1 — $6,500,000 THS Roof Improvements, Artificial Turf Field Replacement Project
- Town of Wethersfield Question 1 — $4,000,000 ladder truck and rescue truck
Quick answers
- What does a YES vote on Town of South Windsor Question 1 mean?
- South Windsor would approve $15,000,000 in spending and bonds for town-wide road paving, traffic signals, safety devices, culverts, sidewalks and drainage improvements.
- What does a NO vote on Town of South Windsor Question 1 mean?
- South Windsor would not approve this $15,000,000 spending and bond authorization.
- How many votes does Town of South Windsor Question 1 need to pass?
- A simple majority: more than half of the YES and NO votes on this measure must be YES. Leaving it blank doesn't count either way.
- Should I vote yes or no on Town of South Windsor Question 1?
- SpectrumVote doesn't endorse anyone or tell you how to vote. Read what a YES and a NO vote each do, and the official text, then decide based on what you want to happen.
- When is the vote?
- The general election was Tuesday, November 3, 2026. Counts are unofficial until each state certifies its results over the following weeks; your state or county election office has the official results.
See something wrong on this page? Report a problem · Corrections